Answer

To set up a new project in Analyst® software, navigate to the Tools menu and select Project.

Analyst project creation

If subprojects are desired, then they should be created at the same time as the new project. Often Data is selected as a folder for a subproject, while the other projects are kept at the project level so methods and batch information can be shared across subprojects. Select Ok. The subproject will show up in the project drop down menu in the format Project/Subproject (see below, circled in red).

User-added image

User-added image